Maneuverable machine; the TG 231 has a length of only
3 meters.
Low maintenance costs, easy maintenance
Easy to maneuver, simple to use
The solid construction of the tunnel dome
and 6mm steel achieves great stability and omits any
weak points in the structure. In addition, the powder coating
dust protects against corrosion.
All wear plates are chrome steel
Robust shaft with balanced rotation, which rotates properly
that properly rotates the compost material (from the inside to the
Exterior)
Fast aerobic composting; in 8 - 12 weeks, depending
of the material
Large and wide tires for low ground pressure
A large wheel supports the turning tunnel.
Many options for retrofitting, such as
– Single pass fabric cover; with which the hard manual work
manual labor in the case of wet fabric is avoided
- Inclination of the tunnel system (so that the battery remains
where you want to have it)
- Complete irrigation system
- and more